CONCRETING OF BARANGAY TOGAWE ROAD

PAMANA-DA 
(Payapa at Masaganang Pamayanan-Deparment of Agriculture)

Grant: P9,200,000.00

Equity: 1,054, 538.90

Approved Budget for the Contract: P9,915,642.67

Contract Cost: P9,850,636.80

Contractor: HKP Construction and Supply

Target: 5,365.65 square meters of Portland Cement Concrete Pavement


The project covers a little over 3,500 linear meters (with exception) from the boundary shared with Tigkiw to the boundary shared with Nazareno. 
































Lunes, Marso 9, 2015

Construction of Water System in Barangay Bagacay

The overhead reservoir tank measures 3.8 x 3.8 x 3.5 m



The tank is located inside the premises of the Bagacay Elementary School

The workers taking their snacks courtesy of the barangay officials. 

Linggo, Marso 8, 2015

KALAHI-CIDSS-NCDDP Special Municipal Inter-Barangay Forum, Gubat St. Anthony Cooperative Founders' Hall, March 5, 2015




The Municipal Inter-Barangay Forum (MIBF) standing for the opening prayer

Mrs. Sandra D. Pura, MSWDO, delivering the opening remarks in behalf of Mayor Roderick Q. Co 


The Area Coordinator, Rudynen S. Elaurza, at the helm


Magdagdag ng caption
SFO4 Jimmy F. Barrameda, head of the Gubat Bureau of Fire Protection and a member of the Municipal Inter-Agency Committee, takes the floor for some important fire protection issues

Raising of hands signifying approval of the final total costs of proposed projects in 10 barangays

Members of the Area Coordinating Team (ACT) and their counterparts from the Municipal Coordinating Team (MCT) serving the refreshments

Members of the MCT at the Registration Table

Biyernes, Marso 6, 2015